Back

How to manage Project Items efficiently?

Imagine you have to check one joint in a complex way. How will you do it? With proper use of Project Items manager you can model it only once, Copy it and make another analysis on the same model or modify it.

 

We have four items in a one file, we checked the EPS - Stress/Strain, ST - Stiffness analysis, CD - Capacity Design, DR- Joint design resistance.

 

Or you can use other way to manage your Project Items, Copy it and make another analysis. This option is available in the top ribbon.

Related articles and tutorials:

Capacity design

Stiffness analysis

Joint design resistance

How to change analysis type

Keywords:

connection, capacity design, CBFEM, copy, stiffness, code-check